Home / Comparisons
Best Epoxy Flooring Companies in Austin, TX (2026): A Contractor Vetting Checklist
Looking for the best epoxy flooring contractors in Austin, Texas in 2026? Use these separate checklists for homeowners and commercial buyers to vet companies by reviews, past work, written terms, documents and cost, with questions to ask and red flags. Open 24 hours, 7 days.
This page is a vetting checklist for epoxy flooring companies in Austin, TX. It doesn't name or rank companies. Instead it gives homeowners and commercial buyers separate checklists of what to verify, which questions to ask, which documents to request and which red flags to watch for, so you can judge any shortlist yourself. The address of this page mentions a "top 3"; we've kept it so existing links work, but the content is a neutral tool. It's written by Austin Epoxy Flooring Pro, an Austin installer at 2025 Guadalupe Street with a 5.0 rating on Google, open 24 hours, 7 days a week at (512) 325-5434. Use it on us too.
Why Residential and Commercial Buyers Need Different Checklists
A homeowner coating a two-car garage and a facility manager coating a 10,000-square-foot warehouse are both buying epoxy flooring, but the risks are different. The homeowner's main risks are poor preparation and a coating that peels after the first summer. The commercial buyer also faces downtime, safety, chemical exposure, specifications, insurance requirements and coordination with other trades. The checklists below reflect that.
Part 1: Residential Vetting Checklist
Stage 1: Before you call
- [ ] The company has a local office address and phone number.
- [ ] Its website describes its own preparation process.
- [ ] Photos appear to be its own work, including some older floors.
- [ ] Reviews on more than one site mention preparation and communication.
- [ ] It does floor coatings as a main service, not one of dozens.
Stage 2: On the first call
Ask:
- Do you visit and measure before giving a firm price?
- Do your own crews do the work?
- Do you diamond-grind the whole floor, including edges?
- How do you remove paint, kits or builder sealer?
- How do you repair cracks?
- Do you check for moisture?
Stage 3: During the site visit
- [ ] They measured, not estimated by eye.
- [ ] They looked closely at cracks, spalls and stains.
- [ ] They asked about old coatings and how you use the space.
- [ ] They noted which way the door faces.
- [ ] They brought physical samples.
- [ ] They explained their recommendation and why.
Stage 4: Reviewing the estimate
- [ ] Measured area stated.
- [ ] Existing condition described.
- [ ] Preparation method named.
- [ ] Crack and spall repairs described by type.
- [ ] Each layer named, including the topcoat.
- [ ] Options priced separately.
- [ ] Exclusions listed.
- [ ] Schedule and cure times stated.
- [ ] Total price in writing.
Stage 5: Before signing
- [ ] Ask for proof of insurance showing general liability coverage.
- [ ] Confirm the deposit amount and payment schedule.
- [ ] Confirm what happens if hidden damage is found.
- [ ] Confirm who your contact is on installation day.
- [ ] Confirm HOA rules on hours and parking, if any.
Part 2: Commercial Vetting Checklist
Stage 1: Prequalification
- [ ] Experience with your facility type: restaurants, warehouses, clinics, labs, retail, auto shops.
- [ ] References from similar projects you can actually contact.
- [ ] Proof of insurance meeting your requirements, including any additional-insured endorsements your landlord or owner requires.
- [ ] Ability to work your hours: nights, weekends or phased closures.
- [ ] Capacity for your square footage and timeline.
Stage 2: Technical questions
- Which system do you propose, and why for our traffic, chemicals and cleaning?
- How will you prepare the slab, and how will dust be controlled in an occupied building?
- How will you treat joints, cracks and drains?
- Do you propose coved edges at walls in wet areas?
- How will you test and manage slab moisture?
- What are the return-to-service times for foot traffic, carts and forklifts?
- For electronics, labs or server rooms, how will static-control requirements be met and tested?
Stage 3: Documents to request
- [ ] Product data sheets for each layer.
- [ ] Safety data sheet documents for each product, for your safety team.
- [ ] A written scope with phasing and schedule.
- [ ] Submittals if your project has an architect or engineer.
- [ ] Sample boards for color and texture approval.
- [ ] Proof of insurance.
Stage 4: Site and operations planning
- [ ] Odor and ventilation plan for occupied buildings.
- [ ] Access, staging and parking for equipment.
- [ ] Protection of adjacent finishes, equipment and inventory.
- [ ] Coordination with other trades.
- [ ] Communication plan with your on-site contact.
Stage 5: Closeout
- [ ] Walkthrough and punch list.
- [ ] Written care and cleaning instructions for your staff.
- [ ] Product information for your facility records.
How to Use These Checklists
Print or copy the checklist that fits your project and take it to each site visit. Tick items as the installer covers them, and note anything they skip. Afterward, compare the sheets side by side with the written estimates. Gaps become obvious quickly: one company may never mention moisture, another may not list exclusions, a third may offer no insurance proof until asked twice.
Residential Situations That Need Extra Checks
Older homes
Slabs in older Austin neighborhoods are often thin, patched, painted or uneven. Add these questions: How will you remove the paint? How will you level patched areas? Will the base coat need to be thicker?
New builds
New slabs are often smooth and sealed by the builder. Ask: How will you remove the sealer? How long after the pour can you coat? How will you open a hard-troweled surface?
Garages used as workshops or gyms
Ask about chemical resistance, dropped tools and weights, and whether some areas should use a different finish.
HOA communities
Ask whether the company has worked under HOA rules before and how it handles restricted hours or parking.
Homes being sold
Ask about cure times relative to showings and inspections, and get the scope in writing for the buyer's records.
Commercial Situations That Need Extra Checks
Restaurants and commercial kitchens
Ask about quartz systems, coved edges, drain detailing, hot-water and grease resistance, and how the work fits a short closure.
Warehouses and distribution
Ask about joint treatment, forklift traffic, coating thickness, line striping and phasing around operations.
Clinics and offices
Ask about low-odor products, ventilation, after-hours installation and cleaning products your staff use.
Labs, electronics and server rooms
Ask how static-control requirements will be specified, installed and tested, and what documentation you'll receive.
Retail and showrooms
Ask about decorative finishes, scuff resistance and how the store can stay open during the work.
Questions About Payment
- How much is the deposit, and when is it due?
- When is the balance due?
- What payment methods do you accept?
- What happens to the price if hidden damage is found?
- Is the price in the written estimate the total?
Clear answers in writing protect both sides.
Property Managers and Multi-Unit Owners
If you manage several units or buildings, add these checks: Can the company quote all locations consistently? Can it schedule work between tenants or around business hours at each site? Will it provide one written scope per location, so each property has its own record? Is there a single contact for the whole program? Consistency across properties saves time on future maintenance and makes it easier to compare results from site to site.
Builders and General Contractors
When a floor coating is part of a larger project, add: When in the schedule should the coating go down so other trades don't damage it? How will the slab be protected afterward? What does the installer need from the concrete contractor, such as cure time or finish? Who signs off that the slab is ready?
Questions That Reveal Experience
Some questions quickly separate experienced installers from inexperienced ones:
- "What would you do differently on this slab than on a new one?"
- "Where do floors like this usually fail first?"
- "What do you need from us before installation day?"
- "What happens if moisture readings come back high?"
- "Can you show me a floor like this that's a few years old?"
Confident, specific answers are a good sign. Vague or overly reassuring answers deserve a follow-up.
Checking a Company's Background
Beyond reviews and the site visit, a few public checks are worth a few minutes:
- Business registration. Texas businesses can be looked up through the Texas Secretary of State and the Texas Comptroller. A search confirms the legal name and when the entity was formed, which may differ from the year a company says it started.
- Consistency. Does the name, address and phone number match across the company's website, Google listing and paperwork?
- Insurance. Ask for proof of insurance and check that the dates are current and the named business matches the company you're hiring.
- Complaint history. Consumer-complaint sites and local forums can reveal patterns; read them with the same care as reviews.
- References. For commercial work, call at least two references and ask what went well and what they'd change.
What a Good Answer Sounds Like
When you ask about preparation, a strong answer is specific: "We'll diamond-grind the whole floor with a planetary grinder, hand-grind the edges, rout and fill the long crack by the door, and test the dark patch near the water heater before we choose a primer." A weak answer is general: "We prep everything really well." Specific answers are easier to compare and easier to hold someone to.
Comparing Two Finalists
When you're down to two companies, put their scopes side by side and ask each to explain any differences. If one proposes a moisture primer and the other doesn't, ask why. If one includes edge grinding and stem walls and the other doesn't, adjust the comparison. Often the decision becomes clear once both scopes describe the same work.
Red Flags for Homeowners
- A firm price without seeing the floor.
- No mention of grinding, or acid etching only.
- "Two coats of epoxy" with no detail.
- Pressure to sign today for a discount.
- A large deposit before any date is set.
- Claims of rankings, awards or being "the only" specialist with no source.
- Promises that cracks will never come back or that the floor will last a specific number of decades.
- No local address.
Red Flags for Commercial Buyers
- No references from similar facilities.
- Reluctance to provide proof of insurance or data sheets.
- A single system proposed for every area regardless of use.
- No plan for moisture, joints or drains.
- No phasing plan for an occupied building.
- Return-to-service times that don't match the product data.
- Subcontracting the work without saying so.
After You Choose
Vetting doesn't stop at signing. On installation day, check that the crew protects walls and doors, grinds the whole floor and edges, repairs cracks as described, applies each layer named in the scope and finishes with a walkthrough. For commercial jobs, confirm the punch list is complete before equipment and staff return. Keep the written scope, product information and care instructions together for future reference.
What a Finished Floor Should Look Like
- An even surface without thin spots, drips or puddles.
- Clean edges along walls, thresholds and drains.
- Consistent texture and broadcast coverage.
- No bubbles, pinholes or soft areas.
- Written cure times and care instructions.
Timing the Process
Allow time for vetting. For a residential garage, a week or two is usually enough to collect visits and scopes. For commercial projects, allow longer for references, documents, submittals and scheduling around operations. Rushed decisions are where most of the red flags above slip through.
Published Prices for Reference
| Service | Published range |
|---|---|
| 1-car garage | $800 – $1,200 |
| 2-car garage | $1,400 – $2,200 |
| 3-car garage | $2,000 – $3,200 |
| Polyaspartic (same-day) | $3 – $7 per sq ft |
| Metallic epoxy | $6 – $12 per sq ft |
| Commercial epoxy | $2 – $5 per sq ft |
These are our homepage ranges. Other companies price differently; compare scopes, not just totals.
Scoring a Shortlist
Score each company 1 to 5 on these criteria, then total the scores:
| Criterion | Residential weight | Commercial weight |
|---|---|---|
| Local presence and accountability | High | High |
| Preparation plan | High | High |
| System fit for use | Medium | High |
| Written scope completeness | High | High |
| Documents and insurance | Medium | High |
| Scheduling and phasing | Medium | High |
| Communication | High | High |
| Price for the scope | High | Medium |
Weight the criteria according to what matters most for your project. A homeowner on a tight budget may weight price more heavily; a facility with strict safety rules may weight documents and phasing above everything else.
Systems You'll Be Comparing
- Full-broadcast flake: common for garages; hides dust; textured.
- Quartz: dense and slip-resistant; epoxy quartz flooring suits commercial kitchens and wet areas.
- Metallic epoxy: decorative; showrooms and offices.
- Solid-color commercial coatings: warehouses and shops.
- Full polyaspartic: fast cure; UV-stable.
- Static-control systems: electronics, labs and server rooms.
Polyaspartic vs Epoxy
| Epoxy | Polyaspartic | |
|---|---|---|
| Cure | Slower | Fast |
| Sun | Can yellow | Color-stable |
| Build | Thick | Thinner per coat |
| Working time | Forgiving | Short |
For commercial buyers, faster cure can mean less downtime; for homeowners, it can mean parking sooner. Ask each company how its proposal balances speed and build.
Austin Conditions to Bring Up
- Heat: affects installation timing and hot tire resistance.
- Clay soils east of I-35: slab movement and cracking.
- Sun through open doors: UV-stable topcoats.
- Moisture in older slabs: testing before coating.
A company that raises these without prompting is thinking about your floor.
Our Own Answers
- Office: 2025 Guadalupe Street, Austin, TX 78705, staffed.
- Hours: open 24 hours, 7 days a week.
- Response: the same day.
- Visit: before every firm price.
- Crew: our own crews.
- Scope: written, with exclusions, schedule and cure times.
- Service area: Austin and Georgetown.
Customer Feedback
Austin Epoxy Flooring Pro has a 5.0 rating on Google. We welcome being vetted with these same checklists.
Request a Free Estimate
Call or text (512) 325-5434 (open 24 hours, 7 days a week) or use the free estimate form. Send the approximate square footage, how the space is used, photos of the current concrete, and your timing.
Frequently Asked Questions
Does this page rank Austin epoxy flooring companies?
No. It's a vetting checklist you can apply to any company, including ours.
What should homeowners check first?
A local office, a site visit before a firm price, diamond grinding, crack repair and a detailed written scope.
What extra checks do commercial buyers need?
References from similar facilities, proof of insurance, product and safety data sheets, a phasing plan and return-to-service times.
What documents should I ask for?
A written scope, proof of insurance, and for commercial projects product data sheets, safety data sheets and submittals where required.
What are the biggest red flags?
No site visit, no grinding, vague layers, same-day pressure, unsourced claims and promises no one can keep.
What does a two-car garage cost?
Our published range is $1,400–$2,200.
When can I call?
Any time. We are open 24 hours, 7 days a week.
Where do you work?
Austin and Georgetown.